Skip to main content

Contract manufacturing

Precision parts,
made to
perform.

Kestrel Precision Manufacturing builds machined components, sheet metal fabrications, and mechanical assemblies for industrial OEMs. Every job is quoted against your drawings, with scope, tolerances, and documentation confirmed in writing before work begins.

Processes
Machining / Fabrication / Assembly
Basis of supply
Built to your drawing
Quotation
Written scope, price, lead time

01 / Capabilities

Three processes.
One purchase order.

Each capability is scoped against your drawings at quotation. Select a process to see how we review the work and what to include in an RFQ.

02 / How work starts

From RFQ to delivery

  1. 01

    Submit your RFQ

    Send part details, quantities, and timing through the RFQ form. No drawings needed yet, since controlled documents come later, over a secure channel.

  2. 02

    Engineering review

    We review manufacturability against your requirements and come back with questions before assumptions, including DFM flags where a change saves cost.

  3. 03

    Written quotation

    You receive a quotation with scope, pricing, lead time, and documentation requirements stated in writing. No instant estimates, no surprise line items.

  4. 04

    Production & delivery

    Approved work is produced, inspected to the agreed plan, and dispatched with the agreed documentation package.

Close view of precision machined mechanical components in an assembled mechanism (illustrative photography, not a Kestrel part)
Fig. 02: Machined component detail, illustrative

03 / Quality approach

Quality is planned,
not inspected in.

Inspection requirements are agreed at quotation, before the first chip is cut. Critical features, measurement methods, and reporting formats are defined per part, so what you receive matches what was quoted.

  • Inspection plans defined per part at quotation stage
  • Revision control so the current drawing is the only drawing
  • Documentation and certificates scoped to your requirements
  • Certification status shared directly during qualification

04 / Request a quotation

Have drawings
ready?

Send the part details first: quantities, material, timing. Drawings are exchanged afterward over a secure channel, under NDA where required.